M232-24 Port of Devonport – Berth 3E Diving Works

Mariners are advised diving works will be undertaken from 11 June 2024 to 14 June 2024 to remove a beacon column, concrete block and beams at the seabed level. The works will involve diver-operated broco underwater cutting and the Rebecca Lily barge and crane to lift the structures. The work will be undertaken from 0700 – 1700 hours.

A listening watch will be maintained on VHF 14. Alpha dive flag will be displayed when diving is underway.

Vessels are advised to maintain a low wash in the vicinity of the works area and keep a safe distance (50 m minimum) from the dive location during the hours of operation.

Berth 3E Diving Area