M087-26 West Ulverstone – Leven River Bridge Works
Mariners are advised that bridge works will commence at the Leven River Bridge from Tuesday, 10 March to Monday, 1 June 2026. Works will occur between 06:00 and 18:00 hours, Monday to Friday.
A support barge will be in operation and will remain lit at night. A temporary mooring will be installed on the northern side of the bridge, on the eastern side of the river. The mooring will be marked with large surface floats and lit at night. VHF Channel 16 will be monitored.
Mariners are requested to maintain a distance of 50 metres from the barge, reduce speed to 5 knots and keep wash to a minimum in the area.