M306-22(T) River Derwent – Bridgewater – Installation of Buoys to mark Submarine Power Cable
As part of the new Bridgewater Bridge construction works, the submarine power cable that runs from Bridgewater to Granton will need to be marked.
Weighted yellow buoys will be deployed on either side of the navigation channel directly above the submarine power cable.
Buoys will be in place from 30 August 2022 until 8 August 2025.
Mariners should navigate with caution.