M428-24(T) Port of Burnie – Sub-Sea Asset Inspection Works
Mariners are advised that sub-sea asset inspection works will be undertaken from Monday, 9 December to Friday, 20 December 2024 and from Monday, 6 January to Friday, 17 January 2025 in the Port of Burnie at the following locations:
- Berth 3 breakwater;
- Berths 5, 6, 7 and associated mooring dolphins;
- Island breakwater
The works will involve the deployment of a remotely operated vehicle (ROV) controlled from a surface craft (callsign XH759) for the Berth 3 breakwater and Island Breakwater. The vessel (callsign XH759) will be displaying the Flag Alpha when ROV operations are in progress.
For Berths 5, 6 and 7, the ROV will deploy from the wharf topside and will display the Flag Alpha at the berth edge.
The Master of the ROV will maintain a listening watch on VHF Ch14 at all times.
Mariners should navigate with caution in the area.