10 tonne axle load on the wharf finger pier and 20 tonne point load on main wharf
Vessel Load Limit
100 t displacement on wharf finger pier and 150 t displacement on main wharf
Power
Yes - 1 x 3 phase outlet and 2 x single phase outlets. Power is managed by Peter Paulsen 0419 372 342
Water
Yes
Lighting
Yes
Load/Unload
Yes
Nearby Services
Toilets
Car Parking
Petrol
Marine Dealer
GPS Validation Mark
Fire Hose Reel
Diesel Bowser
The concrete wharf is 718 m ².
A heavy load lane is delineated in red on the wharf.
The Wharf has load and unload area, as well as restricted area of 3 days to berth a vessel. All other times vessels must be relocated to a mooring or other facility.