![](https://mast.tas.gov.au/wp-content/uploads/2014/10/P1130807Triabunna-Deepwater-Jetty-300x300.jpg)
The concrete jetty is 218m²
This jetty is a load and unload jetty only, delineated with yellow lines
A blue navigation light is located on the jetty head
The concrete jetty is 218m²
This jetty is a load and unload jetty only, delineated with yellow lines
A blue navigation light is located on the jetty head